Karepiro Development
Stages 1 & 2A
Project Information
Client Cabra Developments
Location Stanmore Bay, Whangaparaoa
Value $6,400,000
Completed October 2014
Duration 2 years
Engineer/PM Woods, Brian Flood
Details

52 lot stage of a 219 lot subdivision

  • 220,000 m3 of high strength cut to fill
  • 30,000 m3 shear keys with drainage
  • 120 m Palisade retaining wall to stabilize a large 1:3 batter
  • 5,230 m2 Road pavement with 1300 lm of foot paths and services
  • 3 x large sediment ponds to enable the future earthworks stages
  • 2,000 lm of Stormwater & Wastewater reticulation
  • Retaining walls to majority of sites